  • Valid ISO 9001 + internal audit records; SPC in active use.
  • CE/ROHS/REACH as needed; raw material traceability.
  • NCR quarantine and 8D closure discipline.

Materials & Heat Treatment

  • Carbide grades (e.g., YG8C/YG11C) and supplier list; incoming inspection and batch reports.
  • Heat‑treat recipes and furnace calibration; braze cross‑section, carburization/decarb control.
  • Tip/base matching, solder/braze parameters logged.

Process Capability & Tooling

  • Critical dimensions Cpk ≥ 1.33; runout/coaxiality control.
  • Tooling registry and TPM schedules.
  • Special processes for extra‑long/deep‑hole/large dia (e.g., inner cooling/chip evacuation).

Incoming/In‑Process/Final QA

  • Incoming AQL with 100% checks on critical attributes; sampling plans and reject criteria.
  • In‑process patrol checks; first/last article confirmations; capability sampling logs.
  • Final life sampling and torque/impact tests; retain original test records.

Delivery & Peak‑Season SLA

  • Rolling schedules, peak‑season capacity locks and contingency plans.
  • On‑time delivery metrics and rework/re‑inspection flows.
  • Private label packaging specs and barcode/label verification.

Docs & Retains

  • PPAP (if applicable), SDS, COC/COA, batch retains with traceable IDs.
  • Change control (ECN) and golden sample library.
  • Confidentiality and controlled technical access.

Pre‑Audit Preparation

Document Checklist

  • Company profile: license, org chart, line/headcount, key role qualifications
  • Quality docs: quality manual, procedures, WIs, SPC/control plan samples
  • Supply chain: critical raw list and Tier‑2s; incoming AQL/CTQ standards
  • Process capability: heat‑treat curves, braze logs, equipment registry & calibration
  • Performance & issues: FPY/RTY, returns/recalls, 8D/5Why samples

Scope & Risk

  • Scope by product families and CTQs (e.g., tip grade, braze strength, hardness band)
  • Risk score by volume/changeover, outsourcing ratio, historical defect rate
  • High‑risk for NPI/special processes (heat‑treat/braze) with higher witnessing
  • Cross‑functional team: Quality, Process, Planning, Purchasing

Agenda Template

  • 09:00‑09:30 Kick‑off, scope, risk alignment
  • 09:30‑11:00 Gemba walk (incoming‑warehouse‑process‑final‑retains)
  • 11:00‑12:00 Document checks (traceability, calibration, SPC, CAPA)
  • 13:30‑15:00 Witness (heat‑treat/braze/key metrology)
  • 15:00‑16:00 Close‑out, CAPA draft, milestones & owners

Audit Day Flow

  1. Gate Sampling: Randomly pick last 3 batches of FG/WIP; cross‑check traveler vs. actuals
  2. 5M1E Sweep: Man/Machine/Material/Method/Measurement/Environment; watch outsourcing & rework
  3. Witness Tests: Re‑measure hardness/runout/coaxiality; delta vs. records ≤ 10%
  4. Traceability Walk: Order→Batch→Incoming→Process→Final→Retain; draw the closed‑loop map
  5. 8D Retro: Pull 1 historical 8D; validate corrective and preventive effectiveness

Scoring & CAPA

DimensionWeightPass ThresholdTrigger CAPA
QMS/Compliance20%≥ 80/100Any mandatory evidence missing
Materials/Heat‑Treat20%≥ 85/100No furnace calibration or grade mismatch
Process Capability25%Cpk ≥ 1.33Any CTQ Cpk < 1.00
QA & Retains15%AQL executedCTQs not 100% inspected
Delivery & SLA20%Peak OTD ≥ 95%No capacity lock or contingency
  • Red Lines (e.g., falsified records) → Immediate stop‑ship + 100% re‑inspection
  • Timeline: D3 draft, D7 corrections, D30 effectiveness check
  • Follow‑up: Weekly report + on‑site re‑audit; then move to quarterly maintenance audits

Case Study: Peak Season

Context: Peak months Aug‑Oct, orders +60%, historical OTD dropped to 88%.

Issues

  • High outsourcing (> 35%) delaying incoming; schedule favors hot orders, frequent changeovers
  • Heat‑treat bottleneck: High night‑shift failure rate; no loop‑closed curve deviations

Actions

  • Signed rolling capacity lock (8 weeks): minimum guaranteed capacity + over‑production incentive
  • Introduced freeze window (2 weeks): block changes/expedites; minimum lot size for changeovers
  • Heat‑treat preventive maintenance + backup recipe; add night‑shift technical support

Results

  • OTD up to 97%, changeovers −42%, scrap −0.6pp

Glossary

  • AQL: Acceptance Quality Limit; risk‑based sampling intensity
  • Cpk: Process capability index; dimensional stability
  • PPAP: Production Part Approval Process; for NPI/changes
  • CTQ: Critical‑to‑Quality characteristic; impacts function/safety
  • CAPA: Corrective and Preventive Actions; includes effectiveness validation
  • SLA/OTD: Service Level Agreement / On‑Time Delivery

Need a printable checklist? Contact us for a tailored version and an engineering consult.

Technical Tags

#audit
#checklist
#OEM

Share this Technical Guide

RELATED CONTENT

Recommended Reading

Continue exploring professional technical resources to deepen your engineering knowledge